Client Anglo American – Los Bronces Mining
Location Región Metropolitana, Chile
Date 2008
Flow 6,000 Equivalent Inhabitants
Solution Wastewater treatment

Water treatment plant

The project located at 3,200 meters above sea level, consists of the design, supply, assembly and commissioning of 4 modular treatment plants to meet the needs of wastewater treatment, during the construction and operation period of the mine.

The technology used corresponds to activated sludge in conventional aeration mode. This corresponds to one of the first projects in which Ecopreneur designed modular treatment plants installed 100% inside 40-foot shipping containers.

Back to list

Projects