Client AUSENCO – Justa Mine
Location ICA – Perú
Date 2018
Plant capacity 650 m3/day and 106 m3/d
Solution Drinking water treatment plant

Drinking water plant

Supply of 2 plants, with filtration and disinfection technology to abate turbidity, suspended solids and bacteriological contamination to provide the Justa Mine camp with drinking water.

The process begins with the discharge of surface water and continues with pre-chlorination for initial disinfection, filtration with automatic head multimedia filters and post-chlorination to ensure disinfectant power until the last point of water consumption.

The scope of this project covers the development of detailed engineering and supply of equipment.