Client YANACOCHA MINING
Location CAJAMARCA – Perú
Date 2019
Plant capacity 16,800 m3/día y 6,552 m3/día
Solution Procesos

Lamellas sedimentation

Design of two inclined plate settlers, Lamellas type, as a prior treatment for the removal of TSS to the coagulation-flocculation process for entry into the ultrafiltration system.

The scope of this project covered engineering and equipment supply

Back to list

Projects